Saturday, April 3, 2010

MAISON GRANDE-DIGUE HOUSE - Foundation


Maison Grande-Digue House is designed with double 2x4 insulated, exterior stud walls @ 24" o.c. separated by a 3-1/2 inch fully insulated space to isolate the exterior walls from thermal bridging. The outside double stud walls would be erected prior to construction and erection of the interior partition walls. The inside stud walls are designed to be load bearing while the outside stud walls are designed to carry the exterior finish. The cold side of the inside stud wall is completely covered in a 6 mil vapor barrier then sheathed with 1/2 inch CDX plywood sheathing to provide lateral bracing as well as protect the vapor barrier.

Red dashed line shows location of the 6-mil vapor barrier in the wall system. Red dots show locations where barrier is sealed with acoustical caulking.

Experience has shown that the vapor barrier can be safely installed inside the wall as long as 2/3 of the insulation is on the cold side of the barrier. Locating the vapor barrier at the cold side of the inside stud wall allows for installation of electric without penetrating the vapor barrier. The cold side of the outside stud wall is sheathed with 1/2 inch fiberboard sheathing, then covered with house wrap. The design allows for the walls to be framed and insulated on the floors and lifted in place using wall jacks. A perimeter truss with 2x4 vertical blocking in line with the 2x4 wall studs above is required to carry the loads to the foundation. Details for optional balloon framing and openings are provided in the links and will be discussed later.

The Maison Grande-Digue House foundation walls are formed using LOGIX insulated concrete forms. While not a fan of rigid insulation, insulated concrete forms do have their place in the design of a foundation. The two layers of insulation used in the ICF system provides R20 insulation for the basement plus facilitates installation of finishes both inside and outside as well as easing reinforcing placement. The concrete foundation walls also create an effective vapor barrier. Care should be taken in laying out the exterior dimensions of the building and height of basement walls to match the dimension of standard ICF components (standard LOGIX block is 16" high x 48" long x depth desired). The 12" x 24" footings are the standard architectural overkill. Adjustments are feasible based upon engineering for local soils and conditions.

As mentioned in an earlier posting, crawl space and slab-on-grade foundations are also feasible, but space must be made on upper floors for mechanical equipment. See links to construction details for additional details and foundation systems.


MAISON GRANDE-DIGUE HOUSE - Roof


Roof trusses at the main building block of Maison Grande-Digue House are parallel chord trusses to allow for 18 inches of glass fiber batt insulation (R60). The roof trusses are installed at 24 inches on center in line with wall studs below. 6-mil vapor barrier is attached to the bottom chord of the truss. Gypsum wallboard or other desired finish is attached to the truss chords on 1x4 furring strips at 16 inch on center perpendicular to the trusses.

The benefits of installing radiant barriers are still in question. If used, I would recommend attaching the radiant barrier taping all joints to the bottom chord of the trusses after installing the vapor barrier, but prior to installation of the furring strips.

Roofing material is TRACC Moderne Slate roof shingles over ice shield underlayment. This is a 50-year roofing material made locally from recycled materials capable of withstanding a 175 mph wind driven rain. This is a very important feature on the Northumberland Strait where northeasters are not uncommon. The roofing sheds snow easily so consideration must be given to sliding snow in our climate. The roofing also works well for a rainwater collection system (guttering not shown).

Maison Grande-Digue House is designed with double 2x4 insulated, exterior stud walls @ 24" o.c. separated by a 3-1/2 inch fully insulated space to isolate the exterior walls from thermal bridging. The outside double stud walls would be erected prior to construction and erection of the interior stud walls. The inside stud walls are designed to be load bearing while the outside stud walls are designed to carry the exterior finish. The cold side of the inside stud wall is completely covered in a 6 mil vapor barrier then sheathed with 1/2 inch CDX plywood sheathing to provide lateral bracing as well as protect the vapor barrier.

Red dashed line shows location of the 6-mil vapor barrier in the wall system. Red dots show locations where barrier is sealed with acoustical caulking.

Experience has shown that the vapor barrier can be safely installed inside the wall as long as 2/3 of the insulation is on the cold side of the barrier. Locating the vapor barrier at the cold side of the inside stud wall allows for installation of electric without penetrating the vapor barrier. The cold side of the outside stud wall is sheathed with 1/2 inch fiberboard sheathing, then covered with house wrap. The design allows for the walls to be framed and insulated on the floors and lifted in place using wall jacks. A perimeter truss with 2x4 vertical blocking in line with the 2x4 wall studs above and below is required to carry the loads to the foundation.

Details for optional balloon framing and openings are provided in the links and will be discussed later.

MAISON GRANDE-DIGUE HOUSE - Foundation @ Root Cellar

The foundation walls at the root cellar of the Maison Grande-Digue House are constructed using LOGIX insulated concrete forms. While not a fan of rigid insulation, insulated concrete forms do have their place in the design of a foundation and in particular a root cellar. The two layers of insulation used in the ICF system provides R20 insulation for the basement plus facilitates installation of finishes both inside and outside. The concrete foundation walls also create an effective air and vapor barrier.

Being as this is a root cellar, it is necessary for a cool, damp environment to be created. The floor of the cellar therefore is an exposed earthen surface. PVC vents are installed to control the temperature and humidity of the cellar.

The ceiling framing of the root cellar must be isolated from the moisture generated in the cellar and insulated from the cooler temperatures of the cellar. The 6-mil vapor barrier is applied to the bottom flange of the floor joist, then covered with furring strips and the cellar finish.

MAISON GRANDE-DIGUE HOUSE - Roof @ Kitchen Extension

Roof trusses at kitchen extension are raised heel trusses to allow for 18 inches of glass fiber batt or blown insulation (R60). The roof trusses are installed at 24 inches on center in line with wall studs below. 6-mil vapor barrier is attached to the bottom chord of the truss. Gypsum wallboard or other desired finish is attached to the truss chords on 1x4 furring strips at 16 inch on center perpendicular to the trusses.

The benefits of installing radiant barriers are still in question. If used, I would recommend attaching the radiant barrier taping all joints to the bottom chord of the trusses after installing the vapor barrier, but prior to installation of the furring strips.

Roofing material is TRACC Moderne Slate roof shingles over ice shield underlayment. This is a 50-year roofing material made locally from recycled materials capable of withstanding a 175 mph wind driven rain. This is a very important feature on the Northumberland Strait where northeasters are not uncommon. The roofing sheds snow easily so consideration must be given to sliding snow in our climate. The roofing also works well for a rainwater collection system (guttering not shown).

Maison Grande-Digue House is designed with double 2x4 insulated, exterior stud walls @ 24" o.c. separated by a 3-1/2 inch fully insulated space to isolate the exterior walls from thermal bridging. The outside double stud walls would be erected prior to construction and erection of the interior stud walls. The inside stud walls are designed to be load bearing while the outside stud walls are designed to carry the exterior finish. The cold side of the inside stud wall is completely covered in a 6 mil vapor barrier then sheathed with 1/2 inch CDX plywood sheathing to provide lateral bracing as well as protect the vapor barrier.

Red dashed line shows location of the 6-mil vapor barrier in the wall system. Red dots show locations where barrier is sealed with acoustical caulking.

Experience has shown that the vapor barrier can be safely installed inside the wall as long as 2/3 of the insulation is on the cold side of the barrier. Locating the vapor barrier at the cold side of the inside stud wall allows for installation of electric without penetrating the vapor barrier. The cold side of the outside stud wall is sheathed with 1/2 inch fiberboard sheathing, then covered with house wrap. The design allows for the walls to be framed and insulated on the floors and lifted in place using wall jacks.

Details for optional balloon framing and openings are provided in the links and will be discussed later.

MAISON GRANDE-DIGUE HOUSE - Second Floor

SECOND FLOOR PLAN

Maison Grande-Digue House second floor plan features two bedrooms under a sheltering roof with central full bath under a roof dormer. Attic areas would be accessible for additional storage. As mentioned previously, these homes were originally built with finishing of the second floor as an option.

The exterior gable end walls continue the double 2x4 stud walls from below. Casement windows are chosen to fit into the stud spacing to reduce framing. Final finishes and detailing to be selected by owner.

The main building component is framed with parallel chord trusses to allow for high level of insulation.

See column at left for link to architectural detailing.

MAISON GRANDE-DIGUE HOUSE - First Floor

FIRST FLOOR PLAN

Maison Grande-Digue House has a compact first floor floor plan featuring a living room, kitchen / dining space, full bath, bedroom and den. Externally, the home is shown with a wrapping deck connecting entries to living room and kitchen.

The main floor bedroom would facilitate use of the home as a young couple, family or retired couple. The den could be used as a second small bedroom, guest room, sewing room, etc.

The exterior walls are fully insulated, double 2x4 stud walls @ 24" o.c. (16" o.c. spacing may be required in high wind areas or as a preference of the owner). Triple paned casement window units are sized to fit into the stud spacing to reduce additional framing (OVE engineering). Final finishes and detailing would be decided by the owner.

More specific detailing can be found in the details links provided in the column at left.

MAISON GRANDE-DIGUE HOUSE - Basement

BASEMENT PLAN

The Maison Grande-Digue House is designed with an unfinished full basement with a root cellar. With the exception of the mechanical room and stairs, the space can be used as needed by the owners for storage, laundry or hobbies.

The basement walls are constructed using insulated concrete forms (ICF) manufactured by LOGIX.

Specific detailing can be found in the detail links located in the left column.